贝肯新能源
BC NEW ENERGY

Engineering Cases




NRStor Project: NRStor Project's 2MW flywheel energy storage project, located in Minto, Canada, serves the Eastern Canadian power grid’s independent grid frequency modulation.




Guelph Project, Ontario: Thesuccess of the Minto project prompted the Eastern Canadian power grid to adopta 5 MW facility in Guelph, Ontario, aimed at serving the local grid frequency modulation with a design life of 20 years.


Aruba Project: This Island grid projectis located on Aruba Island in the Caribbean and is the first Island gridproject in the world. The project is 5MW, representing 5% of the nation’scapacity. Aruba aims to use flywheels to integrate renewables to and regulate electricity throughout the island.



Address: No 1, Second Street, International Airport Logistics Zone, Free Trade  Zone (Airport Economic Zone) ,Tianjin Contract:Mr Zhao Tel:0086-22-24817575  Fax:0086-22-24817575 E-mail:bkxny@bne-fess.com